Until 23 March 2024 (estimated), works shall be conducted on the airfield to change the designations of the taxiways, rapid exits, holding positions and runway access, apron gates and intermediate holding positions. The works to be performed to change the airfield designations consist of modifying the road markings and installing vertical signage displaying the new designations.