Jump to content

Recommended Posts

  • Administrators
Posted

This update can be downloaded via the iniManager.

v3.00

-Added parallax to terminal 2, 2b, 3, 4, 5a, 5b and 5c.
-Interior added to ATC Tower.
-Clutter added to ATC Tower roof.
-Added static people to terminal 2, 5a, 5b, 5c and ATC Tower.
-Raised jetway bridges at terminal 5a for realistic clearance.
-Modifications to terminal 5b for improved real-world accuracy.
-Additional details for terminal 5a, 5b, 5c.
-Bollards added to all terminal stands.
-Improvements to the maintenance area.
-Improvements to T5 Industrial area.
-Fixed z fighting issues at terminal 5a
-Added additional model details such as stillages and substations
-Updated barless tugs and belt loaders with new models
-Fully updated groundpoly to match the current airport layout
-Added marking details around all terminals
-Airport-wide optimisation of all assets and lodding.

 

1.png

3.png

inisceneEGLLV3_4.png

inisceneEGLLV3_5.png

8.png

  • Like 3
  • Thanks 7
  • Sam pinned and featured this topic
  • Sam unfeatured and featured this topic
  • Sam unpinned, unfeatured, locked and unlocked this topic
  • Sam pinned and featured this topic
  • Sam unfeatured and unpinned this topic

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...